WS7 Oko 17
Oko Ake Sakowin
Monday, Jun 14 to Sunday, Jun 20, 2010: high 85, low 44
Six years ago this week Mom and I hold a rebar to indicate the approximate peak of the cockpit roof. The upright pipe immediately to the left of me and in the middle ground, and the rebar we are holding, and the Butte in the far distance, are all in alignment. This picture was taken the evening of June 18, 2004 the day the concrete trench footings were poured. The upright rebars were bent horizontal and poured into the stem walls that encompassed the floor slab.