WS9 Oko 41
Oko Wikcemna Topa ake Wanji
Monday, Dec 3 to Sunday, Dec 9 2012: high 59, low 3
Started grading the hocoka Wednesday. The major goal is to contour the terrain so that moisture will run to the two main drains in the hocoka, one of which is in the foreground above. The other is in front of the opposite bay on the far left side of the picture. These drains have standpipes now, but once the grading is complete, the standpipes will be cut off and grates installed at ground level to channel water under existing structures and beyond the hocoka.