WS15 Oko 51
Oko Wikcemna Zaptan ake Wanji
Monday, Feb 11 to Sunday, Feb 17, 2019: high 52, low -5
At noon on Monday, Dan and i framed and sheeted the north and east walls of the sauna. We are building the walls on the sauna floor, then leaning them against the wall on the left of the picture. It is incredibly nice to be able to work inside in a heated space. Dan and i (and everyone else who helped here) did a lot of work outside in all sorts of inclement weather as Wingsprings was built. We are fortunate; and i sure like to keep in mind everyone who has worked at Wingsprings.