Monday, Jan 25 to Sunday, Jan 31, 2021: high 55, low 1 gust 25 mph, moisture 0.01"

Corey helped out a couple days this week and we were able to finish sheeting the wall he is working on in the photo above. We also framed the south wall of the workshop up to the ceiling of the garage. So the walls of the workshop are in place. The large doorway in front of Corey will be filled with the French doors that are now in the library. Those doors will be removed from their current location sometime when the weather is nice, and in their place we will install the large window that is now in the south wall of the cockpit. Then we will install a new sliding window to replace the one we move. In summary: the library’s French doors move to the garage’s woodshop; the cockpit’s south window moves to the library; a new window (currently stored in the garage) is installed in the cockpit. The goal is to get this all done early this spring.